Installation Instructions
151174 3-13
3.5.7 Wiring and Configuring Master and Satellite Units
This Section describes how to properly wire and configure satellite units to the master unit in
an installation.
In installations where users have access to more than one entry point a satellite units can be
installed. Each 5083 or 5084 can be configured as a master or a satellite unit (see Section
3.5.7.3). Only one unit in the system can be the master unit.
3.5.7.1 Wiring a Satellite to the Master unit
Connect a satellite to the master unit as shown in Figure 3-8.
Figure 3-8 Connecting a Satellite to the Master Unit
Note: Satellite units Do Not require a separate transformer. Satellite power is provided by terminals 11 & 12 of
the master unit. Do Not connect backup batteries to the satellite unites.